Adventure at SM2OAN

SM2NOG and I went up to SM2OAN to help him put up 36m of OH8QD tower and antennas this weekend at his island QTH. It’s a beautiful place and we enjoyed the food, company and also the work very much. The weather was pretty much perfect, even though I got showered by rain while being in the tower on Sunday. SM2NOG did the climbing on Saturday putting up the first four antennas and I did most of the climbing on Sunday putting up the lower four antennas. SM2OAN himself put up the 12m yagi at around 10m height.

I managed to take some pictures of the work.

5el for 20m up

Today and yesterday I got some help from SM2XJP and SM2LIY to get the 20m 5el CUE DEE monobander up in the air. The weather was very nice, a bit windy yesterday but otherwise it was very nice with just a few minus degrees. This tower is the WARC tower, which is supposed to hold the 12/17 duobander and also the 6m yagi. But since we did not get the 40m military tower up this year we decided to put the 5el mono in this one, making us a lot more flexible on 20m.

It has got an alfa spid rotor. These kind of towers are horrible to climb when you have a rotor in them, because you can barely get your feet in to stand properly. So its not a fun experience working in them. When me and SM2XJP were putting a connector on the RG-17 inside the house he said to me “Mike, did you remember to put the center connector in the 7/16 connector” and my response was something like “f**king s**t”. Eager to try the antenna that its working as it should I did a climb in total darkness with a headmounted flashlight which was actually quite nice. The SWR looks good over the whole band and tomorrow I will connect the cables for the rotor so I can get it rotating as well.

The yard got cleaned up

This weekend SM2LIY was working the Scandinavian Activity Contest as SOAB LP. We did not know that the ACOM 2000A that we got sponsored by Ojojoj Music AB would show up before the contest, so SM2LIY was signed up for SOAB LP on the Swedish “National Team” in the contest. The propagation’s during the night with aurora ruined the chances of taking a new Swedish record, but Pelle seem to finish in second place after OH5Z.

On Friday I did connect the last antennas since we dug the cables down in the ground earlier in the summer, to prepare for the contest. I also built a mould which will be used to make the concrete base for the 40m tower. Hopefully next weekend we get to borrow an L70 tractor to get some gravel and maybe the concrete mixer from my neighbor, so we can start making the base for the tower.

On Saturday SM2XJP had borrowed a tractor that we used to move the tower sections and all the wood left from the house work during the summer. I have a small hay barn which is 20m2 that has been standing empty, so we moved the wood there and also the insulating material which was left for the last wall of the house, which will be finished next year. When SM2XJP got tired in his clutch foot I got to drive the tractor which was a lot of fun but when it got too exciting he got to take over 🙂 Now the yard is starting to look decent again but still some cleaning to do before we can call it ready for the winter, which hopefully wont arrive in a while if we are going to get that 40m tower up.

SG3P has borrowed me an TS480HX that I will be using to remote control the station. The openASC system is supporting control of all antennas etc remotely and now I’ve started to make it so that we can control it over ethernet as well, which will make it even more neat. However to make the station fully steerable I will need to add my rotator boards into the rotator controllers so we can turn the antennas remotely.

We got sponsored by SM2O and his Microbit 2.0 AB company with lots of remote gear. The well known remoterig system which is an excellent product to make remote operation enjoyable with very low latency, possibility to send clean CW etc. All in all we got a complete set of RRC-1258MkII with an extra control unit for SM2XJP, a Webswitch 1216H and also an RC-1216H for controlling the ACOM amplifier. I soldered some cables for this so hopefully I will have it operational after the weekend!

Stay tuned…

Moskojärvi, a real adventure

The weekend of 7-9th of September a brave bunch of men (and Anna) went up to Moskojärvi to take down an old 60m high rotatable OH8QD tower which was put up in 1983. This tower must have been one of the biggest setups in the world by that time, since it held 4/4/4/4el on 20m, 3/3el on 40m plus some smaller antennas which were a 4el for 15 and 5el for 10m. Giselle, our host was very kind to us and we got the tower and all accessories for free if we just took it down. So it costed us some gasoline money and the cost of a crane for 6 hours.

I had seen the tower a few times when going between Luleå and Kiruna for work, but I had never stopped. I had heard that it was painted and in very bad condition so I did not really ever care about the tower, since in that case it would have been ruined by this time. SA5BJM called a few years ago and talked about that the lady had given him the tower if he just took it down and asked if I was interested but I said no, since it was in bad shape. But then last year Aloys, PA3DAT sent me pictures of the tower during his trip through Sweden and I could see on the pictures that the tower was galvanized, which changed the interest in the tower drastically. So me and SM2XJP took a trip up there to check it out (450km one way drive) and it was in beautiful shape. The antennas looked like trash but the tower and all hardware such as guy wires looked like it was put up last year, so we got very interested and decided to take it down. However it did not happen last year and I was about to postpone the plans this year too because of both economical but also the lack of time. However, SM3JLA thought I would be stupid to postpone it and when SG3P (SK3W) offered to join us I decided we should try this autumn. So after a bit of planning we had decided for the weekend 7,8,9th of September. We would arrive on Friday, start taking down antennas on Saturday and the crane would arrive on Sunday morning sometime between 8-9.

Everything went very smoothly and SG3P did most of the climbing with SM2NOG helping out a bit in the beginning. I was lucky enough not needing to climb at all, which was probably for the best since I was feeling a bit stressed about things the whole weekend. The most tricky part was taking down the 3el for 40m which was broken in half, but that was taken down without any big problems and by Saturday evening the tower was stripped off and the only antenna left was the top 3el for 40m.

The crane driver was not very happy when he arrived, since he though the ground looked very soft. But I told him that it is very hard 20cm below the surface but many has probably told him that before, without it being true. But after a bit testing he discovered that I was right and he was good to go. It took a bit longer than I expected but the total cost of taking down the tower (excluding gasoline for the cars) was below what I had expected.

Of all the aluminium in the tower most can be used again. The 40m beams looked to be in pretty good shape and I can without a doubt use the material to build the 2 pcs of 40m yagis (2el) that I have been planning to put up in the 40m military project. Also a 4el for 15m will be used and put up @EU in the 18m tower (currently also holding 4el for 20  @EU and 5el for 15m rotatable). There was also a 5el for 10m that was in pretty good shape, one element missing but otherwise OK.

Giselle was a great host and seem to enjoy our company at the cabin and also stayed to bbq with us during Saturday evening. We had a great time, things went smoothly and big thanks to SM3JLA, SM2NOG, SG3P, Anna and me for helping out during the weekend. SM2Z also stopped by a while to say hello on Saturday.

The tower is planned to be put up next year, either in the summer or winter depending on if we will use a crane or not to put it up. Plans are to build a 2el monobander for 80m (probably ~23-27m long elements) and 4x6el or 5x6el stack for 15m. A big 10m stack is currently postponed for next solar cycle peak.

It is so many pictures, so I was too lazy to write texts to all of them, but enjoy! And for Swedish speaking people (or people using google translate) there is also a post about this on Elektronikforumet, http://elektronikforumet.com/forum/viewtopic.php?p=875356#p875356