Most of July was spent re-routing cables from the house to the new shack. It was a lot of work but I managed to get it done. I also got help a week by SG3P (SK3W) which is always nice and also SM2UVU came up and helped while Gunnar was here.
We also managed to fix the 40m 4-SQ. The control cable was re-routed to the Moskojärvi tower to hookup on that 40-lead cable. One of the vertical posts had been pulled up out of the ground a bit by the frost, so that the cable had pulled out of the vertical. Easy fix.
We also managed to get one radio up and running inside the new shack.