I had SM3SGP up here from Thursday to Monday. We built openASC devices for his station since he is going to implement that at his big contest station http://www.sk3w.se. We had a lot of fun even though it was stressful at the end. I estimate that between 4000-5000 components were placed. There are some pictures on his website.
General I/O
This weekend I hope that we have enough people to put up the broken 80m vertical again. I need to drill a bigger hole in the aluminum bottom but otherwise it is pretty much ready to be put up. Other plans are to finish up the 2nd 6el Yagi for 20m and try to find a problem with the current 6el yagi, there is some bad connection somewhere, hopefully in some connector. I will try to post some pictures during the weekend.
Comments are closed.