Gallery – 2010

  • 20090410
20100108_openASC

stackboxes_1

Building the powersplitters for the station

6x2_1

Building the 6x2 with 7/16" connectors for the station

6x2_measurements

Measurements of the 6x2 switch with 7/16" connectors

powersplit_1

Powersplit prototype built

cq160m_2010

40m_vhp_lp_filt1

QRO LP filter for 40m

20100227

Pix of the some homebrewing

arrldx2010_sm3wmu

20100305

powermeter_pckup

20100317_openASC

Panels for the openASC boxes milled.

20100328

Snow snow snow

20100404_openASC

openASC development

20100419

20m yagi work

20100417

Various stuff being done outside

20100420

Some work done on the phase box for the 20m stack

20100424

Work in the switch room and also some work on the 20m yagi

20100425

Fixed 80m vert and cable mess

20100422_openASC

Some pictures of openASC

20100429

Some EMC tests of openASC

20100430

20100508

Doing beverage work in the forrest

20100523

Some work done at SJ2W

openASC_general_io

General I/O card designed primary for SK3W station

20100528

Taking down the last stuff at the old SM3 QTH

20100605

Outside work, mostly with the 18m tower

20100606

Put up the 18m tower

20100613

Various work done, mostly in 18m tower and assembly of a 15m yagi

20100619

20m_l_match

L-match built for 20m

20100702

15m 5el mono up

20100708

Work on the 4el for 20m

iaru_2010

Pictures from the hoist of the 2nd 6el yagi for 20m. We also did work IARU as SK9HQ on 20m SSB and made over 3500 qsos.

40m_yagi_build1

Building the top 3el 40m yagi

40m_yagi_build2

40m_yagi_build3

The last day of building the 40m yagi

40m_yagi_build4

SM3JLA pix of the 40m beam build

20100804

Some various pictures

20100816

6/6/6el stack complete for 20m

20100821

Connected the phase box for the 20m stack

20100829

160m vert finished

20100926

Finished the 6/6el stack for 15m

20100929

Power meter and L-match

20101005

L match for 15m

sacssb10

Scandinavian Activity Contest SSB 2010

notch_filter_20m

20m notch filter W2VJN design

4cx1500b_amp_1

2x4CX1500B amp part 1

20101016

Fixed the 3el for 40m

20101024

CQWW DX SSB 2010 SO2R setup

20101025

Work out in the switch room

4cx1500b_amp_2

More of the 2x4CX1500B amp

4cx1500b_amp_3

2x4CX1500B amp

cqwwcw2010

CQWW DX CW 2010

20101128_2

CQWW DX CW 2010 #2

4cx1500b_amp_4

Part four of the 2x4CX1500B amplifier