January update 2019

The month of January was mainly getting stuff organized in the workshop. I built a material rack to get all material from the floor so I can use that space better. I also managed to get the CNC to mill some and also tried exporting some code from Fusion 360 to use on it and it seem to work properly (spoiler, it does work).

I also spent some time trying to fix the 80m vertical for the 4-SQ but in the end I gave this up because of my energy being low and the snow that came made it very hard. So this will be done in the spring instead. The station is undergoing a makeover anyway since everything is being moved out into the new building.