Now most of the snow is gone and the real season starts. Now its time for lots of outdoor work and my mom and dad came up on Friday with 110m2 of isolation material for the attic, which was bought through SM3WMU since he has got a good discount. The work done during the weekend is that me and SM3JLA did some work on the room we’ve been building out in the barn. Me and my girlfriend spent time cutting down a tree that was half dead and burned the branches and also did some preparations for where the 40m tower will be placed. This will require more work in the forest but its fairly few trees that need to be taken down, probably under 50. The yard was also cleaned and I built a small box to put the 220m long lifting rope we use to hoist antennas up the towers. I found some old box that I extended so it got bigger and held the whole rope.
We also finished up the work on the chimney. So now I will check its no leaks and if that is the case I will do some work downstairs to get the fireplace at its proper position so we can start getting some heat in the basement again.
I took pictures myself as well but unfortunately I forgot the camera at SJ2W so I will update with those pictures as soon as I go down there again, probably on Thursday afternoon. These pictures are mostly taken by my gf Anna and the last picture is taken by SA2AWO, who visited us with family and picked up an 2m amplifier that has been stored at SJ2W.
Comments are closed.