This weekend I didn’t manage to get a lot done at the station. The horrible autumn weather made my mood bad and all I managed to get done was to lift the pieces of tower in place and assemble them. I also attached the two level of guy lines, attached the control cable for the rotor, so now its ready to be hoisted. I have scrapped the original plan of using a tree to winch it up, because the angle didn’t get 100% and also the tree feels a bit too weak. So I need to figure out how to get it up because I don’t feel like using a ginpole either. That is very time demanding and the top section weighs a bit too much for me to feel safe about it. So either we’ll use the small village crane or get an excavator to pull it up, I’ll make some calls.
Comments are closed.