A lot of the work during November revolved around getting the heating working in the new workshop. I also got a CNC milling machine from a company nearby that wanted to get rid of it. So considering it was free I could not say no and arranged so that a friend picked it up while he was going by with his truck for work. SM2UVU also helped me getting some lights installed outside the shop which made a huge difference. I also spent some time putting feet onto my welding table plus I built a metal workbench from some parts I had gotten from GTL earlier.
GTL also gave me a bunch more dirt for the driveway and Emil came by and leveled it out and made it look nice. In 2019 when the spring has ended and the ground is dry I will finish it off by putting a fabric down and buy some gravel to put down.
Comments are closed.