Today I got a lot done on the foundation work for the 60m tower. I finished up the boom struts for the 15m yagis and the 17m yagi. I made a form for the bottom plate measuring 1.2×1.2m and the rebar cage as well. The gravel in the bottom of the pit was evened out and is about 20-30cm thick. Tomorrow I will hopefully get enough done so that I am able to pour the concrete either tomorrow evening or on Saturday, we will see…
Comments are closed.