Here is an update from the last two weeks at SJ2W. I’ve done some various work and pretty much gotten the room downstairs for the operators to sleep in. I also made a major cleaning of the kitchen and added a new kitchen table I got donated from a friend. Next is to clean the room where I sleep and move the desk I have there downstairs so I can get my office down there and maybe get some order in my bedroom as well. Right now it’s just a big pile of stuff in there.
I also got new electricity into the barn so now I have a 3-phase outlet there and all electricity in the barn will be routed to the new fuse box instead.
A welding cart was started to be fabricated because I am very tired of needing to carry all stuff out every time I need to weld. The welder isn’t heavy but now I will make a cart with shelves etc where I keep all welding equipment so its all in one place and easily moveable.
SM2XJP also mounted a hitch on his car, so now it will be easier when we need to transport things and not needing to borrow a car with a hitch. I can’t understand in the beginning why cars are being sold without them 🙂 Don’t everybody need to move a tower from time to time?
I have also re-routed my plans a bit for this summer. Now the focus will be trying to get the Moskojärvi 60m tower up this summer and get the 30el 15m stack operating so I am trying to sort all things out regarding this.